How to...Schedule Breakdowns Through Preventative Maintenance
Column
How to...Schedule Breakdowns Through Preventative Maintenance
- A few seconds saved per truss can lead to substantial savings by the end of the year.
- It may only take an hour to fix the ma-chine, but you have lost 14,400 seconds of time for a crew of four assemblers.
- Weekly machine evaluations and scheduling breakdowns make it easy to keep track of your long-term maintenance plan and are an excellent way to keep production moving right along.