Installation Instructions
Column
Installation Instructions
- Sending a Jobsite Package with each truss delivery is a good way to share safe installation and bracing recommendations with framers.
- In the near future, SBCA is committed using SBCRI testing to optimize BCSI guidelines.
- We hope to change bracing design by combining temporary and permanent bracing into one step.
- Information about installation tolerances can be found in the B1 Summary Sheet.
2011 April