Question: 

What is the correct method of attaching scissors trusses to the top plate? I read recently in a trade magazine that this type of truss should be toe-nailed on one end and attached with slotted clips on the other end. According to the article, this is to allow for movement of the truss. We require PE stamped spec sheets from the truss manufacturer to verify trusses meet wind and snow loads. These sheets give bracing requirements but never give recommended attachment requirements.

Question: 

I am thinking of using wood trusses for the roofing/ceiling structural systems on some houses I shall build. I remember, though, an engineer/volunteer fireman commenting back in 1989 that the connector plates are prone to expand and pop off, early on in a fire, causing catastrophic structural failure. Was this the case, and if so, has this problem been corrected?

Question: 

Can I safely install 3/4 in. T&G, OSB on 2x4 trusses that are 24 in. O.C.? My roof was installed over 5/8 in. plywood without clips that have caused a lot of sagging and the shingles need replacing. I want to “fix” it one time and install architecture type shingles, but the garage is 24 ft. wide and 28 ft. long without any load bearing walls. My concern is the weight on the trusses. 5/8 in. plywood weighs 52 lbs. and the OSB weighs 78 lbs. for each 4 ft. x 8 ft. sheet. The roof will require about 84 4 ft. x 8 ft. sheets to cover, which equals about 2,184 lbs.

Question: 

In a hip roof application where jack trusses connect to a girder truss using pressure blocking (power blocking), what is the proper installation and the span that is acceptable before a hanger is required?

Question: 

If you use hurricane clips to secure roof trusses from uplift, are you allowed to use fewer than the typical three nails in the bearing heel of the roof truss? I am concerned because we want to do the right fastening schedule, but three nails in addition to the hurricane clip splits the wood. What is the standard recommendation?

Question: 

I am a building inspector and have some questions regarding how to apply IBC 2012 2308.8.5 (IRC 2012 R802.8) (similar IBC 2015 2308.4.6 & IRC 2015 R802.8) to trusses, especially those with high heels:

Question: 

I recall seeing a design recommendation several years ago regarding installation of hanger nails above the neutral axis of the bottom chord of a plated girder truss. The intent was to avoid dumping large loads into the bottom chord, below the neutral axis. Can you tell me where I can find this information?

Question: 

Are there any trusses that are supported strictly by the wood itself without any mechanical connections such as brackets?

Question: 

Girders are trusses specially designed to carry extra loads that are a result of the structural framing members they support. Sometimes a single ply girder truss is insufficient to carry the entire load, so the truss designer designs a multiple-ply girder. This is where identical trusses are built and fastened together to act as one unit to support the load. ANSI/TPI 1 states that girder trusses up to three plies thick can be fastened together with nails. Girders over three plies must be pre-drilled and bolted rather than nailed.

Question: 

I am a building inspector and I have a question on information provided on truss design drawings. What does the uplift reaction number represent? Some manufacturers are very specific and state “to provide for mechanical connection of the truss to the top plate with a connector capable of withstanding a specific load.” Others simply list the uplift reaction with no further information. These are the ones that have caused a debate as to what the number actually represents.