Question: 

In a hip roof application where jack trusses connect to a girder truss using pressure blocking (power blocking), what is the proper installation and the span that is acceptable before a hanger is required?

Question: 

I have just moved into a new home and during the construction I noticed that one of the trusses in the garage was damaged. The web plate had come off in two different locations. I notified the builder and they said they would take care of it. Approximately two weeks after I moved in, I noticed the ceiling in the garage started to sag, so I went into the space above the garage and found the truss was never repaired. I again notified the builder and they sent someone to fix it. I went and looked at the fix and this is where my question comes in.

Question: 

How do trussed roofs perform in long-term service? Are there any reports of rusting in the nail plates, rot/insect attack, do-it-yourself modifications, or condensation and ventilation problems in the attic?

Question: 

The Gypsum Association “Fire Resistance Design Manual” (GA-600-12) lists file RC2601 with two layers of 5/8 in. gypsum wallboard (GWB) on wood joists.

Question: 

If trusses blew down from insufficient temporary bracing and the contractor put them back up without the knowledge of the truss manufacturer and gave the truss manufacturer a letter stating that the trusses were okay, is that sufficient? Do you know of any truss manufacturer who would accept this?

Question: 

I am installing a 40-foot scissor truss that is designed to deflect about ½ inch. I am concerned that the deflection will cause an interior partition wall to pick up some load from the truss and transfer it to the floor system. Should I double up the I-joists under this partition to pick up the extra load?

Question: 

I am a truss manufacturer in an area of the country that often has some pretty severe winters. It concerns me how little some of the local builders seem to know about snow load design. What are some of the things that need to be considered?

Question: 

I am a structural engineer designing pool cage structures that are typically attached to the house at the fascia board. Sometimes, the structure is attached where trusses are behind the fascia board and other times there is a framed gable end overhang. Do you know of any information concerning this additional load on the trusses or overhang under design wind loads? Is there a limiting distance on the amount of overhang? I know trusses are designed for certain uplift and the pool cage will add to this uplift at design load, but what about the gable end overhangs?

Question: 

Are there any trusses that are supported strictly by the wood itself without any mechanical connections such as brackets?

Question: 

I am remodeling a 16-year-old ranch style home. The roof consists of 4/12 26 ft. span trusses, 24 in. O.C., over 2x4 stud walls. What is the recommended means of affixing the top plate of new interior partitions to provide the lateral support needed for the partition? Also, I want to hang a soffit above and overhanging the new kitchen cabinets (recessed lighting placed within). What is the recommended means of attaching the soffit to the underside of the trusses so as not to interfere with the designed movement of the trusses under the variable live load experienced (snow load)?