Scope of Work

Question: 

We have a customer that bought trusses in June. The trusses were shipped [ and one month later are] being set. The chords have weathered and bowed. What is the industry standard for dealing with this problem? What is our liability in this situation? We were not aware of any delays on the customer’s part and shipped as requested. Note: These trusses are 62 ft. scissor trusses.

Question: 

We have been specifying laminated veneer lumber (LVL) beams for some time now. The plans usually state, “Beam to be engineered and supplied by truss manufacturer.” What kind of liability issues do I need to watch out for?

Question: 

I am reviewing a truss package that includes multi-ply trusses. Where do I find the requirements for the attachment of the individual trusses to each other (nails and/or bolts)? Is this a requirement that the structural engineer of record needs to supply or is it the responsibility of the truss manufacturer to design?

Question: 

Do you have information on purlin grades and species to meet 50 psf top chord live load using 2x4s on edge 24 in. O.C. over trusses at 6 ft. O.C.?

Question: 

How important is continuous lateral bracing in roof trusses? Is it detrimental to the roof integrity if it is missing?

This presentation provides information on sealed truss placement diagrams in relation to the International Residential Code.

This presentation provides inspection and quality assurance requirements for metal plate connected wood trusses.

This presentation provides information on sealed Truss Placement Diagrams for the 2012 or 2015 International Building Code.

It can be often misunderstood whether a Truss Design Engineer has the responsibility to seal a Truss Placement Diagram (TPD). The purpose of this Research Report is to provide the relevant code sections from the latest editions of the International Building Code (IBC) for thorough analysis and interpretation, as they relate to the state of Texas. 

It can be often misunderstood whether a Truss Design Engineer has the responsibility to seal a Truss Placement Diagram (TPD). The purpose of this Research Report is to provide the relevant code sections from the latest editions of the International Residential Code (IRC) for thorough analysis and interpretation.