Performance

Question: 

I have a four-year-old house with glued open-web trusses. Both the truss manufacturer and the builder have admitted to me that the trusses were installed wrong. I have a problem with the suggested repair. I have hired a structural engineer and he suggested installing a 2x10 between each truss and removing the old truss. This would have to take place on both the first and second floors because all the trusses were installed wrong. The manufacturers want to install six strongbacks on each floor, hoping this will tighten them up.

Question: 

I am looking for a 1-hour roof/ceiling assembly for wood truss construction. I would like to apply the drywall directly to the bottom of the truss and also have insulation for sound control. Is this possible without using channels and what UL number would I use?

Question: 

We have a local builder wishing to use floor trusses with a 2-hour assembly. I have shown him the 2-hour design on pages 17-27 of the second edition of SBCA’s Metal Plate Connected Wood Truss Handbook. Is this assembly UL approved? If so, what is the design number?

Question: 

What are the requirements for installing valley sets over roof trusses? I am interested in nailing and support conditions. Some engineers ask for the bottom chord of the valley truss to be ripped to match the roof pitch of the underlying trusses. Is this necessary? How can I calculate values for uplift resistance for the building inspector?

Question: 

Is it possible to construct an assembly for ceiling between first and second floors using 2x with few layers of gypsum to obtain a 3-hour fire rating?

Question: 

Are there any published studies or guidelines on the fire rating of floor trusses built with 2x3 lumber?

Question: 

How do I, as a truss manufacturer, adequately advise my customer against the dangers of 60 ft. and over truss span installations?

Question: 

We have designed a custom home that needs a good solid floor, with low vibration perceptibility. The system we have specified consists of 2 in. of gypcrete over 1 and 1/8 in. thick plywood or OSB. The floor trusses are 20 in. deep at 16 in. O.C., spanning 31 ft. 6 in. The preliminary truss design shows a double top and bottom chord with a total load deflection of 1.30 in. (l/290) and a live load deflection of 0.65 in. (l/581). The basement ceiling will be 1/2 in. gypboard nailed to the bottom of the trusses.

Question: 

The truss industry maintains that the design of truss roof and floor system permanent bracing is the responsibility of the building designer. System permanent bracing covers the entire structure and all bracing element interactions.

Question: 

How do you evaluate whether a metal plate connected truss is still usable after exposure to fire? Are there any recommended tests?