Risk Management

Question: 

We are concerned with SBCA’s BCSI-B1 Summary Sheet which under “Notes” makes a disclaimer. Our concern is if there would be an accident with our trusses and we point out that the bracing was not placed correctly according to SBCA documentation, which is sent with every job. If the accident goes to court, how will our attorney respond when the opposing attorney points out the disclaimer, which infers that the bracing we recommend must be flawed, otherwise it would not be disclaimed?

Question: 

I am looking for a set of guidelines or “rules” for members of the SBCA. Are truss plants really not allowed to speak of business matters? I think that is unfair. I'm not going to call up our competitor and tell them that they aren't charging enough and taking all the business. I just want all the truss plants in my area to get together and decide how we are going to do business. We need to standardize the industry.

Question: 

When you’re selling trusses through a lumberyard and the contractor calls to say that the “trusses don't fit correctly,” who has the ultimate responsibility for the trusses? I argue that the lumberyard is responsible since we have provided them with all the information on how the job was designed, even though they may or may not have passed this information on to the contractor.

Question: 

I have mono trusses on either side of a firewall. I have the fire rating/wall material between them. Can I place a ridge vent above these two? Or should I use vents? How do I calculate the appropriate vent sizes and styles?

Question: 

Is it the responsibility of the truss manufacturer to provide a sealed layout drawing for roof trusses?

Question: 

I have recently heard of a problem with fire-retardant-treated wood (FRTW) trusses that were manufactured and installed in 1965-1980. I was searching for more information, since my job involves the protection of property in our member school districts. I had heard that the trusses make of FRTW during that time period can or will become corrosive to the hardware and the trusses will fail.

Question: 

Is a Class A fire rating (provided by our liquid spray-on fire retardant) acceptable in certain situations?

Question: 

We have a customer that bought trusses in June. The trusses were shipped [ and one month later are] being set. The chords have weathered and bowed. What is the industry standard for dealing with this problem? What is our liability in this situation? We were not aware of any delays on the customer’s part and shipped as requested. Note: These trusses are 62 ft. scissor trusses.

Mike Boswell—production manager of Plum Building Systems—and Chris Lambert—a general manager with Builders FirstSource—both understand how critical it is to cultivate a safety culture that empowers their employees. One way they accomplish this goal is by proactively measuring the success of their safety programs with the often underutilized practice of near-miss reporting.  

Whether increasing fines can force a change in industry safety practices remains to be seen, but one thing is for sure—the cost of failing to comply with OSHA standards is about to rise.