Performance

Fire endurance ratings may be mandated by code for many assemblies in both floor and roof framing systems. This Research Report discusses methodologies to calculate 2-hour fire endurances of a given assembly.

Having a voice and a united group of CMs to drive the industry forward is one of the primary reasons for belonging to our trade association.

Many potential complaints and problems can be mitigated by an astute truss technician during the design phase.

The goal of this Research Report is to assist in designing safe buildings economically, especially when sprinkler systems are required or desired in the design.

A fire endurance rating may be mandated by code for many of the applications where trusses could be used in floor/ceiling, roof/ceiling or in attic separation applications. This Research Report discusses 5 different methods for determining fire resistance.

  • By conducting its own ASTM E119 floor assembly fire testing, SBCA has the data it needs to effectively fight the controversial IRC Section R501.3 code provision and help preserve CMs’ market share.
  • SBCA has drafted template best practice language CMs should consider using in their TDDs, customer contracts and submittal documents to counter the efforts of the lumber industry to shift liability onto end users.
  • Through Framing the American Dream and WorkForce Development efforts, SBCA is actively engaged in helping CMs successfully navigate today’s labor challenges and grow their businesses.
This fall, two houses will be built on adjacent lots in the community of Jackson, WI, a suburb just north of Milwaukee. While the neighborhood is unassuming, and the homes themselves are of average size (2,200 sq. ft.), their impact on the structural building component (SBC) industry will be significant.
  • Manufacturing rough openings in a plant improves site placement accuracy efficiency dues to consistent framing every time. 
  • Componentized wall sections also significantly reduce jobsite waste and allow for the use of alternative header approaches and materials.
  • Having the ability to deliver components just in time to urban jobsites alleviates the need for hard-to-find storage and staging areas.
Learn more about a future industry testing concept for the SBC Research Institute.
  • A series of test concepts have been suggested. SBCA needs your input on these concepts to ensure the industry testing conducted in SBCRI helps improve market opportunities for CMs.
  • The goal of industry testing in SBCRI is to tackle the daily design and framing challenges CMs see, and find solutions that make components even more reliable and cost effective.
  • SBCRI was developed and built specifically for this purpose.