The most effective way to avoid recurrent issues with component installation is to give an SBCA Jobsite Package to the general contractor and framing crew on every job.
Simply having your driver drop the Jobsite Package off with the component package at the jobsite isn’t enough.
Anytime you work with a GC or an inexperienced crew for the first time, consider visiting with them ahead of delivery and walk them through the information in the jobsite package.
The truss industry follows the requirements of the building code and ANSI/TPI 1 for general project scope of work concepts.
The Truss Designer identifies the location of required individual truss member lateral restraint and diagonal bracing on each Truss Design Drawing.
The JOBSITE PACKAGE can prove invaluable in documenting that the CM provided industry best practices on truss bracing, particularly when a project goes in a bad direction.
CMs deal with customers with a wide range of skill sets, including those who have drawn their house plans on a McDonald’s paper napkin. I wish I were making this up!
While CMs are not responsible for ensuring that customers brace jobs correctly, they can provide BCSI documents to help customers build a better building and stay safe.
The BCSI book and B-Series Summary Sheets are a CM's saving grace, especially if the customer plans to install the trusses on their own or not hire an engineer of record.