Business Logistics

Last June, Truss Components of Washington started doing something unconventional: holding regular meetings of production, design and office employees. General Manager Chad Johnson and Production Manager William Blankenship reflected on their six-month-old experiment, sharing why and how they brought these groups together and what the meetings have accomplished.

Just as there’s no one-size-fits-all housing solution, there’s no one-size-fits-all business model for CMs. For the sky-high prices and seasonal swings in the Greater Yellowstone area, tiny houses are uniquely suited to the needs of both buyers and builders.
Teton Truss Tiny Houses
It takes good communication to keep an ongoing upgrade process on track.
Chris Cozart, director of manufacturing systems for Builders FirstSource in Denver, Colorado, believes everyone’s input is needed to build employee buy-in throughout the company and to successfully implement change. 

Sometimes it’s hard to start a conversation. You know what you want to say, you think you know how the person you’re talking to will react, and yet finding the words to get the ball rolling and respond to the questions you know you’ll get is tough.

Question: 

The lumber used in most metal plate connected wood trusses is either visually- or mechanically-graded solid sawn dimensional lumber. However, the Truss Plate Institute's ANSI/TPI 1 allows the use of structural composite lumber (SCL) products such as laminated veneer lumber (LVL), laminated strand lumber (LSL) and parallel strand lumber (PSL). These engineered wood products can conceivably compete with sawn lumber and complement it in truss designs.

Question: 

If trusses blew down from insufficient temporary bracing and the contractor put them back up without the knowledge of the truss manufacturer and gave the truss manufacturer a letter stating that the trusses were okay, is that sufficient? Do you know of any truss manufacturer who would accept this?

Question: 

We have a customer that bought trusses in June. The trusses were shipped [ and one month later are] being set. The chords have weathered and bowed. What is the industry standard for dealing with this problem? What is our liability in this situation? We were not aware of any delays on the customer’s part and shipped as requested. Note: These trusses are 62 ft. scissor trusses.

Question: 

Recently, I was invited to view a newly-constructed 60 ft. by 36 ft. barn, with homemade big timber trusses as follows: 36 ft. span, 12/9 pitch, construction was 26 ft. 2x12 rafters, bracing 2x6, ceiling joists were 36 ft. boxed, 6x12 out of overlapping (6 ft.), 2x12 glued and nailed center, 16 feet of joist doubled as an 8 ft. high loft, floor trusses were on 12 ft. centers atop posts deeply anchored with good footings, roof and wall cross ties were 2x6 on edge every 24 in., floor cross ties in the loft were 2x8 on edge every 16 in., 4 ft. snow load.

Question: 

Is it the responsibility of the truss manufacturer to provide a sealed layout drawing for roof trusses?

Question: 

I am building a new shop that is 30 ft. x 32 ft. I need to free-span the 30 ft. dimension. Where can I get a load chart that recommends lumber size and strategic locations of the angle braces to support the free span? I am going to field erect the trusses and stick build them on the building.